Hydromitem

Hydromitem
A proud member of Hydrogroup

Project type: Survey

Marcopoulo Town and Porto Rafti coastal area sewerage networks

Design of the 14.35 km long Porto Rafti – Marcopoulo Sewer Main and the four Central Pumping Stations, 42.0 km Marcopoulo Town sewerage networks and two local pumping stations, 67.1 km Agios Spyridonas Porto Rafti area sewerage networks and two local pumping stations, 51,7 km Agios Nicolaos Porto Rafti area sewerage networks and two local pumping stations, 84.0 km Prassia-Vourcari Porto Rafti area sewerage networks and three local pumping stations

Greater Athens Water supply – Marcopoulo reservoir, pumpinf station and connection works

Construction of a 9000 m3 water supply reservoir, a twin steel pipeline (Φ1000mm in diameter and 1798 m in length) a with 59m head pumping station and all associated supporting infrastructure.
The project is part of the Modernisation and Upgrading of the Greater Athens Water Supply system providing supply from Stavros and Kiourka aqueducts into the Greater Athens Water Supply System