Tolofon dam in Charmisko location and irrigation networks study
Warning: Illegal string offset 'url' in /var/www/vhosts/hydrogroup.gr/hydromitem.hydrogroup.gr/wp-content/themes/astra/single-project.php on line 45
Warning: Illegal string offset 'title' in /var/www/vhosts/hydrogroup.gr/hydromitem.hydrogroup.gr/wp-content/themes/astra/single-project.php on line 46
Warning: Illegal string offset 'alt' in /var/www/vhosts/hydrogroup.gr/hydromitem.hydrogroup.gr/wp-content/themes/astra/single-project.php on line 47
Warning: Illegal string offset 'caption' in /var/www/vhosts/hydrogroup.gr/hydromitem.hydrogroup.gr/wp-content/themes/astra/single-project.php on line 48
Warning: Illegal string offset 'sizes' in /var/www/vhosts/hydrogroup.gr/hydromitem.hydrogroup.gr/wp-content/themes/astra/single-project.php on line 52
Warning: Illegal string offset 'project-img' in /var/www/vhosts/hydrogroup.gr/hydromitem.hydrogroup.gr/wp-content/themes/astra/single-project.php on line 52
Warning: Illegal string offset 'sizes' in /var/www/vhosts/hydrogroup.gr/hydromitem.hydrogroup.gr/wp-content/themes/astra/single-project.php on line 53
Warning: Illegal string offset 'project-img-width' in /var/www/vhosts/hydrogroup.gr/hydromitem.hydrogroup.gr/wp-content/themes/astra/single-project.php on line 53
Warning: Illegal string offset 'sizes' in /var/www/vhosts/hydrogroup.gr/hydromitem.hydrogroup.gr/wp-content/themes/astra/single-project.php on line 54
Warning: Illegal string offset 'project-img-height' in /var/www/vhosts/hydrogroup.gr/hydromitem.hydrogroup.gr/wp-content/themes/astra/single-project.php on line 54
Location: Region of Sterea Ellada, Fokida, Greece
Client: Region of Sterea Ellada, Fokida, Greece
Years: 2012 - 2013
Project Description:
The Project refers to the Outline Design, Feasibility Study and Detailed Design of an earth dam with clay core ( 35 m high, 320 m long and reservoir capacity of 3,600,000 m3) water intake and 3.8 km irrigation water supply ( serving 450 ha, 2,500,000 m3 total water demand ) along with two intermediate irrigation reservoirs, of 400 and 200 m3 capacity, on Stournarorema – Eratini Stream, in Fokida, Mainland Greece.
The proposed works included:
- Dam Catchment area 46.6 km2 , with average level 745 m and total runoff 15,000,000 m3 / year
- Dam Reservoir Capacity 3,600,000 m3
- Dam Foundations Zone and Concrete Injection Curtain, Embankments Stability
- Diversion Dam and Diversion – Evacuation Tunnel
- Earth Dam Design, 35.0 m high, crest 10.0 m, slopes 1:2.75, 1:2.25, Dam Volume 700,000 m3
- Front-Side Weir 300 m3/s, L type, Drop Channel 10.0 m, Energy Dissipation, Outflow Channel
- Water Intake and Evacuation
- Dam Control Instruments
- Pumping station, valve housing
- Irrigation Pipeline 3.8 km
- Irrigation Storage Tanks 400 m3 and 200 m3
- Irrigation Network 450 Ha
- Preparation of Bill of Quantities and Construction Tender Documents
Services Provided:
- Introductory Report (Data Collection and Supporting Studies Programme)
- Outline Design Study (Detailed Options Analysis)
- Hydrologic Study
- Surveying
- Geological and Geotechnical Conditions Evaluation
- Material Borough Pits Definition
- Dam Foundations and Concrete Injection Curtain Study
- Dam Hydraulic Calculations
- Dam Stability Study
- Earthquake Risk Analysis Study
- Dambreak Flood Wave Runoff Simulation Study
- Dam Civil Works Structural Design Study
- Water Intake and Pumping Station Detailed Design
- Civil Works (pumping station, pipeline, storage tanks, etc.) Hydraulic and Structural Design Study
- Irrigation networks Study
- Preparation of Bill of Quantities
- Cost Estimates
- Tender Documents